Boston Demolition Permit Guide: Dorchester & South Boston

Coverage: Boston, including Dorchester and South Boston. Each line links to the official page it comes from; the source list gives each page’s own date where it shows one, and the date it was checked.

Who issues the permit, and how to apply

  • Boston's Article 85 defines a demolition permit as one issued by the Commissioner of Inspectional Services. — Boston Planning (Boston Zoning Code)
  • Article 85 defines demolition as any act of pulling down, destroying, razing or removing a building, or starting such work with the intent of completing it. — Boston Planning (Boston Zoning Code)
  • Boston issues demolition permits through a short-form permit application filed online; the applicant chooses “removal of structure” as the work type and uploads the documents on the checklist. — Boston Inspectional Services
  • Boston’s short-form permit page describes it as covering work such as opening a wall or minor alterations that do not change a building’s structure or use. — Boston Inspectional Services
  • An owner of a one- or two-family property doing the demolition work personally must complete a homeowner waiver. — Boston Inspectional Services
  • Once the application documents are complete, Inspectional Services’ Environmental Services Division also reviews the demolition permit. — Boston Inspectional Services
  • Once approved, Inspectional Services emails a payment request; after payment the permit can be printed and work can begin. — Boston Inspectional Services
  • Boston says starting work before a short-form permit is issued can bring a double permit charge or a building code violation. — Boston Inspectional Services
  • For short-form permits, Boston says a condo owner in a building with three or more dwellings, such as one floor of a three-decker, must hire a contractor to perform the work. — Boston Inspectional Services

Before demolition starts

  • Also required for the demolition permit: shut-off notices from underground and overhead utilities (gas, electrical, telephone, cable); a closed Boston Water and Sewer Commission general service agreement; MassDEP approval for hazardous materials; and a Dig Safe reference number. — Boston Inspectional Services
  • A licensed builder is required, with supporting documents including the workers’ compensation form, liability insurance and a copy of the builder’s license. — Boston Inspectional Services
  • A Boston demolition permit application needs a letter or bill from a pest control contractor stating that pest management will be performed before and after the demolition. — Boston Inspectional Services
  • Boston will not issue a building permit for renovation, conversion or new construction until the applicant shows the premises have been treated for, or are free from, insects and rodents (City Ordinance Article 16, Section 31). — Boston Inspectional Services
  • A permit from Boston Fire Prevention for the demolition is also required. — Boston Inspectional Services
  • The Boston Fire Prevention Code requires a Fire Department permit for safe Fire Department access before any construction, alteration or demolition begins. — Boston Fire Department

Asbestos

  • All asbestos removal or repair projects in Boston require a Boston Public Health Commission permit. — Boston Public Health Commission
  • Boston’s asbestos regulations require the abatement permit application at least ten days before the project starts, with copies of the asbestos notices the state labor and environmental protection departments require. — Boston Public Health Commission
  • The same regulations require asbestos-containing waste to go to an approved sanitary landfill special waste site. — Boston Public Health Commission
  • Massachusetts requires a written asbestos survey by a state-certified inspector before any demolition or renovation; MassDEP requires notice ten working days ahead for asbestos work, and for construction or demolition projects except in residential buildings with fewer than 20 units. — MassDEP (Massachusetts rules that apply everywhere)

Historic review and demolition delay

  • Boston’s Inspectional Services page says an Article 85 Demolition Delay approval from the Boston Landmarks Commission must be obtained. — Boston Inspectional Services
  • Scope: all buildings in Downtown or Harborpark, all other buildings at least 50 years of age, and all buildings in a Neighborhood Design Overlay District. — Boston Landmarks Commission
  • In the neighborhoods, Article 85’s age test applies to the building, or the portion of it the application relates to, being at least fifty years old. — Boston Planning (Boston Zoning Code)
  • Designated (landmarked) buildings go through a separate review by the Landmarks Commission or the relevant local historic district commission, not Article 85. — Boston Landmarks Commission
  • Before an Article 85 hearing, the applicant distributes a flyer notice to properties within a 500-foot radius, at least seven days before the hearing, not counting Sundays and holidays. — Boston Landmarks Commission
  • If the Commission finds a significant building subject to demolition delay, the Commissioner of Inspectional Services is notified not to issue a demolition permit until ninety (90) days have elapsed following the close of the public hearing. — Boston Landmarks Commission
  • If a significant building is voluntarily demolished in violation of Article 85, Inspectional Services may not issue new-construction building permits for the premises for two years after the Landmarks Commission’s determination. — Boston Planning (Boston Zoning Code)
  • Boston zoning Article 65, Section 32 sets Neighborhood Design Overlay Districts over all or parts of certain Dorchester subdistricts — and every building in such a district is within Article 85. — Boston Planning

Debris and waste-ban rules

  • The City of Boston does not collect construction debris and tells residents to find a private hauler for it. — Boston Public Works

Fees, with the date the town gives

  • Boston’s short-form permit page (November 4, 2026), the application route Inspectional Services gives for demolition, lists a $20 application fee plus $10 per $1,000 of the work estimate, due upfront. — Boston Inspectional Services

Points to confirm before filing

Article 85’s own text counts the ten-day staff determination from the application filing date, and the hearing determination within forty days of filing; the Landmarks Commission page counts from when the application is marked complete. Ask the Landmarks Commission which clock applies to a filing. — Boston Planning (Boston Zoning Code), Boston Landmarks Commission

Statewide guides

Massachusetts Asbestos & Demolition Notifications · Massachusetts Construction Debris Disposal Bans · Where construction debris can legally go: facilities south of Boston

In more depth

Other towns

Demolition Permit Guides for Boston, Quincy and the South Shore · Demolition Services in Boston, MA

Any scope of work that requires a state license is performed by licensed specialists that D. Clancy & Sons coordinates as part of the project.

Sources

  1. Boston Planning (Boston Zoning Code) — Article 85: Demolition Delay (text, adopted March 6, 1995) (dated March 6, 1995; checked November 8, 2026)
  2. Boston Inspectional Services — How to get a demolition permit (dated June 1, 2026; checked November 8, 2026)
  3. Boston Inspectional Services — Short-Form Permit (dated November 4, 2026; checked November 8, 2026)
  4. Boston Inspectional Services — Pest Management (dated December 12, 2025; checked November 8, 2026)
  5. Boston Fire Department — Boston Fire Prevention Code (dated June 27, 2017; checked November 8, 2026)
  6. Boston Public Health Commission — BPHC permits (dated December 12, 2025; checked November 8, 2026)
  7. Boston Public Health Commission — Asbestos Regulations (dated March 8, 1993; checked November 8, 2026)
  8. MassDEP — Asbestos, Construction & Demolition Notifications (checked November 8, 2026)
  9. Boston Landmarks Commission — Article 85 Demolition Delay (dated December 12, 2025; checked November 8, 2026)
  10. Boston Landmarks Commission — Article 85 Requirements: Public Hearing for Significant Structures (marked temporary, as of March 2022) (checked November 8, 2026)
  11. Boston Planning — Dorchester Neighborhood Design Overlay District (checked November 8, 2026)
  12. Boston Public Works — Trash (dated August 28, 2026; checked November 8, 2026)