Weymouth Demolition Permit Guide
Coverage: Weymouth. Each line links to the official page it comes from; the source list gives each page’s own date where it shows one, and the date it was checked.
Who issues the permit, and how to apply
- Weymouth lists demolition among the types of work that require a building permit. — Weymouth Municipal Licenses and Inspections
- Weymouth’s alteration/addition application includes “Demo” as a permit type and asks for a separate application for every building. — Weymouth Municipal Licenses and Inspections
Before demolition starts
- Weymouth’s demolition checklist collects sign-offs from the Board of Health, the electric company, the gas company, and the sewer and water departments (telephone if needed), with lines for a Dig Safe entry and a Historical Commission signature if needed. — Weymouth Municipal Licenses and Inspections
- Weymouth Board of Health Regulation #2 requires any structure to be exterminated by a licensed fumigator before a demolition permit is issued, proven by a signed receipt describing the work. — Weymouth Board of Health
- The application includes a Home Improvement Contractor affidavit noting that M.G.L. c.142A covers demolition work on owner-occupied residences of one to four units. — Weymouth Municipal Licenses and Inspections
Asbestos
- Massachusetts requires a written asbestos survey by a state-certified inspector before any demolition or renovation; MassDEP requires notice ten working days ahead for asbestos work, and for construction or demolition projects except in residential buildings with fewer than 20 units. — MassDEP (Massachusetts rules that apply everywhere)
Historic review and demolition delay
- The Historical Commission’s published copy of Weymouth’s demolition delay ordinance (undated) treats a building as historically significant if built 100 or more years before the demolition application, or of unknown age, among other criteria. — Town of Weymouth
- Weymouth says properties on the Historical Commission’s list of historically significant buildings are automatically subject to the Demolition Delay Ordinance. — Weymouth Historical Commission
- Within seven days of receiving a demolition application, the Inspector of Buildings notifies the Historical Commission in writing. — Town of Weymouth
- The Commission holds a public hearing within 30 days, with newspaper notice at least 14 days before and certified-mail notice to the applicant. — Town of Weymouth
- If the Commission finds a significant building preferably preserved, a demolition permit is not issued for six months after that determination. — Town of Weymouth
- Where a significant building is voluntarily demolished in violation of the ordinance, a building permit may not issue for the premises for one year after the date of that demolition. — Town of Weymouth
Debris and waste-ban rules
- The application includes a construction debris disposal supplement under M.G.L. c.40 §54 naming the licensed facility where the debris will go. — Weymouth Municipal Licenses and Inspections
- Under Board of Health Regulation #29, a hauler or contractor needs an annual Health Department permit before installing, maintaining or emptying a dumpster in Weymouth. — Weymouth Board of Health
- Construction and demolition dumpsters are exempt from the regulation’s tight-fitting-lid and solid-surface placement requirements. — Weymouth Board of Health
Fees, with the date the town gives
- Weymouth’s fee schedule effective July 1, 2024 lists the demolition permit at $20 per $1,000. — Weymouth Municipal Licenses and Inspections
Points to confirm before filing
The same undated copy gives two clocks: one clause withholds the permit for six months after the Commission’s determination, another says the permit issues 183 days from the original application. Confirm the current deadlines with the Inspector of Buildings. — Town of Weymouth
Statewide guides
Massachusetts Asbestos & Demolition Notifications · Massachusetts Construction Debris Disposal Bans · Where construction debris can legally go: facilities south of Boston
Other towns
Demolition Permit Guides for Boston, Quincy and the South Shore · Interior Demolition in Weymouth
Any scope of work that requires a state license is performed by licensed specialists that D. Clancy & Sons coordinates as part of the project.
Sources
- Weymouth Municipal Licenses and Inspections — Building Permit Information (checked November 8, 2026)
- Weymouth Municipal Licenses and Inspections — Building application: alteration / addition (checked November 8, 2026)
- Weymouth Municipal Licenses and Inspections — Demolition Permit Checklist (checked November 8, 2026)
- Weymouth Board of Health — Regulation #2: Extermination of structures prior to permit (dated October 14, 1974; checked November 8, 2026)
- MassDEP — Asbestos, Construction & Demolition Notifications (checked November 8, 2026)
- Town of Weymouth — Demolition Delay: History and Intent (Historical Commission copy of the ordinance, undated) (checked November 8, 2026)
- Weymouth Historical Commission — Demolition Delay Ordinance (checked November 8, 2026)
- Weymouth Board of Health — Regulation #29: Dumpster (dated August 1, 2007; checked November 8, 2026)
- Weymouth Municipal Licenses and Inspections — Fee schedule (effective July 1, 2024) (dated July 1, 2024; checked November 8, 2026)
More guides
- All demolition regulation guides
- Demolition Permit Guides for Boston, Quincy and the South Shore
- Massachusetts Asbestos & Demolition Notifications
- Massachusetts Construction Debris Disposal Bans
- South Shore Transfer Station Debris Rules
- Boston Dumpster Permits
- Boston Site Cleanliness License, Explained
- Boston vs. Quincy Demolition Permits
- Where construction debris can legally go: facilities south of Boston