● Family-Owned Since 1975Serving Boston & the South Shore
Guide

Cohasset Demolition Permit Guide

Coverage: Cohasset. Each line links to the official page it comes from; the source list gives each page’s own date where it shows one, and the date it was checked.

Who issues the permit, and how to apply

  • Cohasset Building Department permits are applied for electronically, but the permit must still be picked up and posted on the site, and no work should start until you physically have it. — Cohasset Building Department

Before demolition starts

  • Cohasset’s pre-permitting procedure requires Board of Health approval for teardowns and demolitions, and DPW approval for projects that affect water and sewer connections, street openings or other utility connections. — Cohasset Building Department
  • Cohasset’s demolition document list requires proof of rodent abatement, submitted to the Health Department and uploaded to the permit application. — Cohasset Building Department
  • The list includes a form letter to neighbors giving the approximate date of demolition. — Cohasset Building Department
  • It requires letters from all affected utilities that services have been properly terminated and, if the property is on Town sewer, proof that a licensed drainlayer terminated the sewer line. — Cohasset Building Department
  • It asks for a signed contract with the demolition contractor, copies of the contractor’s Construction Supervisor License and Home Improvement Contractor cards, and proof of workers’ compensation insurance (not required for a sole proprietor). — Cohasset Building Department
  • Since July 1, 2021, Cohasset requires a pre-permitting meeting with Building & Inspections for new construction, commercial projects, or projects that require permits from multiple boards. — Cohasset Building Department

Asbestos

  • For demolition, Cohasset asks for an asbestos survey and, if asbestos is found, proof of abatement and proper disposal, submitted to the Health Department and uploaded to the application. — Cohasset Building Department
  • Massachusetts requires a written asbestos survey by a state-certified inspector before any demolition or renovation; MassDEP requires notice ten working days ahead for asbestos work, and for construction or demolition projects except in residential buildings with fewer than 20 units. — MassDEP (Massachusetts rules that apply everywhere)

Historic district review

  • Within the Cohasset Common Historic District, a demolition permit may not be issued until the Historic District Commission has issued the required certificate. — Town of Cohasset Code (eCode360)

Debris and waste-ban rules

  • The document list requires a signed contract for waste disposal at a landfill authorized to accept construction waste. — Cohasset Building Department
  • Cohasset’s Recycling Transfer Facility regulations, as amended in January 2018, prohibit disposal of construction and demolition waste from contractors at the facility (Article IX). — Town of Cohasset

Fees, with the date the town gives

  • Cohasset computes permit fees after the application is received and notifies the applicant of the fee by email. — Cohasset Building Department
  • Cohasset’s building fees effective July 1, 2026 cover new construction, additions/alterations and demolition: residential $12.50 per $1,000 of estimated cost, $75.00 minimum; commercial $17.50 per $1,000 of estimated cost, $100.00 minimum; work started without a permit is charged double. — Cohasset Building Department

Statewide guides

Massachusetts Asbestos & Demolition Notifications · Massachusetts Construction Debris Disposal Bans · Where construction debris can legally go: facilities south of Boston

Other towns

Demolition Permit Guides for Boston, Quincy and the South Shore

Any scope of work that requires a state license is performed by licensed specialists that D. Clancy & Sons coordinates as part of the project.

Sources

  1. Cohasset Building Department — Electronic Permitting - Building (checked November 8, 2026)
  2. Cohasset Building Department — Pre-Permitting Procedure (checked November 8, 2026)
  3. Cohasset Building Department — Required Documents for Building Permits (DEMOLITION list and fee note, page 3) (checked November 8, 2026)
  4. MassDEP — Asbestos, Construction & Demolition Notifications (checked November 8, 2026)
  5. Town of Cohasset Code (eCode360) — Cohasset Common Historic District (dated May 4, 2026; checked November 8, 2026)
  6. Town of Cohasset — Regulations for Operation of the Cohasset Recycling Transfer Facility (as amended January 12, 2018, adopted January 23, 2018; Articles V and IX, pages 2 and 4) (dated January 23, 2018; checked November 9, 2026)
  7. Cohasset Building Department — Building Fees (effective July 1, 2026) (dated July 1, 2026; checked November 8, 2026)