Coverage: Quincy. Each line links to the official page it comes from; the source list gives each page’s own date where it shows one, and the date it was checked.
Who issues the permit, and how to apply
- Quincy’s code refers to demolition permits as issued by the Director of Inspectional Services. — City of Quincy Code (eCode360)
- This checklist governs a building permit to perform demolition activities. — City of Quincy Inspectional Services
- The checklist says the listed departments review the online application and must approve it. — City of Quincy Inspectional Services
- Quincy Inspectional Services permit applications are hosted by OpenGov. — City of Quincy Inspectional Services
Before demolition starts
- A natural gas utility letter stating when service was terminated at the street; an electric utility letter stating the same. — City of Quincy Inspectional Services
- Quincy Water Billing Office approval that the water meter was removed by City personnel; Quincy Sewer/Drain Department approval that service was terminated at the street. — City of Quincy Inspectional Services
- A Dig Safe letter or number; a street opening / trench permit from the Engineering Department. Street work may only be performed by approved contractors. — City of Quincy Inspectional Services
- A hydrant meter for dust control, or an invoice for a water truck. — City of Quincy Inspectional Services
- Health Department approval requires a pest control plan from a licensed company, with bait boxes every 40 feet of the site perimeter, inspected bi-weekly. — City of Quincy Inspectional Services
- The checklist requires temporary toilets, registered through the Health Department. — City of Quincy Inspectional Services
- The checklist’s compliance officer section requires daily street cleaning, screened fencing ready to install and a way to wash truck tires on site, and says protection of City drains is strictly enforced. — City of Quincy Inspectional Services
- Where no building permit to construct is ready to issue, the site needs a permanent fence with a gate, a contact placard, and grading level with the adjoining grade. — City of Quincy Inspectional Services
- Quincy’s Health Department demolition protocol calls for at least one walk-through before sign-off, with the owner or an authorized representative present. — City of Quincy Health Department
- At the walk-through, fluorescent fixtures are opened and ballasts without a “No PCBs” label are presumed to contain PCBs; Freon items must be removed, or the owner documents that an approved technician purged them. — City of Quincy Health Department
- Any fuel oil storage tank needs Quincy Fire Prevention sign-off that it is empty and removed under Fire Prevention regulations. — City of Quincy Health Department
- Health Department sign-off is conditional on dust and nuisance control, including water or a misting agent arranged before demolition. — City of Quincy Health Department
- The demolition permit holder must notify the Fire Department in writing before demolition, stating the time and date, and arrange a paid fire detail that stays until demolition is complete and the debris is off the site. — City of Quincy Code (eCode360)
- Quincy’s Construction Management Plan requirements call for police details for trucks entering and leaving a site with material or debris. — City of Quincy Inspectional Services
Asbestos
- Under Health Department approval, the checklist asks for a hazardous material assessment report if applicable, and a copy of the DEP notification for commercial, industrial and residential buildings over twenty units. — City of Quincy Inspectional Services
- For Health Department sign-off the building must be free of asbestos; the preferred proof is a licensed asbestos inspector’s report covering the interior and exterior. — City of Quincy Health Department
- For residential structures built before 1978, in the absence of negative lead analyses, sign-off is conditional on following the 454 CMR 22.11 renovation safety procedures during demolition and debris removal. — City of Quincy Health Department
- Massachusetts requires a written asbestos survey by a state-certified inspector before any demolition or renovation; MassDEP requires notice ten working days ahead for asbestos work, and for construction or demolition projects except in residential buildings with fewer than 20 units. — MassDEP (Massachusetts rules that apply everywhere)
Historic review and demolition delay
- Quincy’s two designated historic districts, Quincy Center and Adams Birthplace, are both in Quincy Center. — City of Quincy Historical Commission
- Section 180-6C of Quincy’s code says a demolition permit for a building within a historic district may not be issued by the Director of Inspectional Services until the Historical Commission issues its certificate. — City of Quincy Code (eCode360)
- Section 180-15 says demolition of buildings in the historic districts other than those on “List A” does not require a certificate from the Commission. — City of Quincy Code (eCode360)
Debris and waste-ban rules
- Quincy’s Debris Disposal Form cites 780 CMR 105.3.1 and M.G.L. c.40 §54: debris from the work must go to a properly licensed waste disposal facility, which the applicant names, with its address, and signs for. — City of Quincy Inspectional Services
- The form says construction debris is not allowed in the City of Quincy trash collection system. — City of Quincy Inspectional Services
- Before Health Department sign-off, items banned from solid waste facilities — lead-acid batteries, whole tires, cathode ray tubes and white goods — must be removed, with proof of legal disposal. — City of Quincy Health Department
- Quincy's DPW Yard is not a landfill and cannot accept household trash or construction debris. — Quincy DPW
- Quincy DPW says contractors are responsible for disposing of construction and demolition debris; on DIY projects, the homeowner is. — Quincy DPW
Fees, with the date the town gives
- Quincy’s building fee schedule (City code dated June 1, 2020) sets demolition at $12 per $1,000 of estimated cost; starting work without a permit doubles the fee. — City of Quincy Code (eCode360)
- Demolishing without notifying the Fire Department and arranging the fire detail carries a $50 fine, and $50 per day for a continuing offense after notice (City code dated June 1, 2020). — City of Quincy Code (eCode360)
Points to confirm before filing
Sections 180-6C and 180-15 of the same chapter read differently: one requires the Commission’s certificate before any demolition permit in a historic district, the other only for List A buildings. Ask the Historical Commission whether a building is on List A. — City of Quincy Code (eCode360)
Statewide guides
Massachusetts Asbestos & Demolition Notifications · Massachusetts Construction Debris Disposal Bans · Where construction debris can legally go: facilities south of Boston
In more depth
Other towns
Demolition Permit Guides for Boston, Quincy and the South Shore · Interior Demolition in Quincy
Any scope of work that requires a state license is performed by licensed specialists that D. Clancy & Sons coordinates as part of the project.
Sources
- City of Quincy Code (eCode360) — Building Construction: demolition and fire detail (dated June 1, 2020; checked November 8, 2026)
- City of Quincy Inspectional Services — Building Permit Checklist for Demolition Activities (Demolition Checklist R2) (checked November 8, 2026)
- City of Quincy Inspectional Services — Applications and Information (checked November 8, 2026)
- City of Quincy Health Department — Demolition Protocol (checked November 8, 2026)
- City of Quincy Inspectional Services — Construction Management Plan (checked November 8, 2026)
- MassDEP — Asbestos, Construction & Demolition Notifications (checked November 8, 2026)
- City of Quincy Historical Commission — Historical Commission fact sheet (checked November 8, 2026)
- City of Quincy Code (eCode360) — Chapter 180: Historic Districts (checked November 8, 2026)
- City of Quincy Inspectional Services — Debris Disposal Form (R2) (checked November 8, 2026)
- Quincy DPW — The DPW Yard (checked November 8, 2026)
- Quincy DPW — How can I get rid of… (checked November 8, 2026)
- City of Quincy Code (eCode360) — Fees: building permit fee schedule (dated June 1, 2020; checked November 8, 2026)
More guides
- All demolition regulation guides
- Demolition Permit Guides for Boston, Quincy and the South Shore
- Massachusetts Asbestos & Demolition Notifications
- Massachusetts Construction Debris Disposal Bans
- South Shore Transfer Station Debris Rules
- Boston Dumpster Permits
- Boston Site Cleanliness License, Explained
- Boston vs. Quincy Demolition Permits
- Where construction debris can legally go: facilities south of Boston