Milton Demolition Permit Guide
Coverage: Milton. Each line links to the official page it comes from; the source list gives each page’s own date where it shows one, and the date it was checked.
Who issues the permit, and how to apply
- Milton’s bylaw defines a demolition permit as one issued by the Building Commissioner for the demolition or removal of a building. — Town of Milton General Bylaws (eCode360)
Before demolition starts
- Milton’s Board of Health demolition policy requires a licensed pest control operator to inspect the structure and the property for rodents and wildlife. — Milton Board of Health
- Before demolition, the owner gives the Health and Building Departments a copy of the pest control plan. — Milton Board of Health
- The Health Department receives the letter mailed to abutters about the demolition, with the abutters’ names and addresses. — Milton Board of Health
- Water or another misting agent must be arranged at the site before demolition; hydrant use needs Water Department pre-approval. — Milton Board of Health
- Underground storage tanks are removed under Fire Department permits, and hazardous materials such as Freon, mercury products, batteries, fluorescent tubes and abandoned chemicals must be removed before demolition. — Milton Board of Health
- A septic system or cesspool on the property must be pumped, collapsed and filled. — Milton Board of Health
Asbestos
- The property must be inspected inside and out by a Massachusetts licensed asbestos inspector, and any asbestos found must be removed by a licensed asbestos contractor. — Milton Board of Health
- Massachusetts requires a written asbestos survey by a state-certified inspector before any demolition or renovation; MassDEP requires notice ten working days ahead for asbestos work, and for construction or demolition projects except in residential buildings with fewer than 20 units. — MassDEP (Massachusetts rules that apply everywhere)
Historic review and demolition delay
- Milton’s demolition review bylaw covers buildings on or eligible for the National or State Register, and any building built in whole or part 75 or more years ago. — Town of Milton General Bylaws (eCode360)
- The Building Commissioner forwards each demolition permit application for a regulated building to the Historical Commission within seven days of filing. — Town of Milton General Bylaws (eCode360)
- The Historical Commission has 45 days from receiving the application to decide whether the building is historically significant; without that notice, the building is deemed not significant and the permit may issue. — Town of Milton General Bylaws (eCode360)
- Within 60 days of a significance finding, the applicant submits eight copies of a demolition plan with a map, photographs, a description, the reason for demolition and the proposed reuse. — Town of Milton General Bylaws (eCode360)
- The Commission holds a public hearing with notice to the applicant and all abutting owners at least seven days before, and the applicant pays the advertising and notice costs in advance. — Town of Milton General Bylaws (eCode360)
- If the Commission finds the building preferably preserved, a demolition permit may not issue for 24 months from the filing of its report, unless it is satisfied the applicant made a bona fide, unsuccessful effort to find a buyer who would preserve it. — Town of Milton General Bylaws (eCode360)
- An owner of a regulated building posing an immediate threat to public safety may request an emergency demolition permit from the Building Commissioner. — Town of Milton General Bylaws (eCode360)
- Demolishing a regulated building without complying with the bylaw bars building permits for that property for two years from the demolition date. — Town of Milton General Bylaws (eCode360)
Debris and waste-ban rules
- The Historical Commission may set reasonable conditions on the disposal of parts of a building being demolished. — Town of Milton General Bylaws (eCode360)
- Milton's DPW states that some items, like construction debris, may require hiring a private hauler. — Town of Milton
Fees, with the date the town gives
- Milton counts demolition and disposal costs in the value of work used to calculate permit fees. — Milton Inspectional Services
- Milton’s Inspectional Services fee schedule, effective May 1, 2009, sets building permits at $12 per $1,000 for one- and two-family work and $15 per $1,000 for all others; work started without a needed permit is charged $36 per $1,000. — Milton Inspectional Services
Statewide guides
Massachusetts Asbestos & Demolition Notifications · Massachusetts Construction Debris Disposal Bans · Where construction debris can legally go: facilities south of Boston
Other towns
Demolition Permit Guides for Boston, Quincy and the South Shore · Interior Demolition in Milton
Any scope of work that requires a state license is performed by licensed specialists that D. Clancy & Sons coordinates as part of the project.
Sources
- Town of Milton General Bylaws (eCode360) — Demolition of historically significant buildings (Ch. 163) (dated June 16, 2025; checked November 8, 2026)
- Milton Board of Health — Demolition Policy (checked November 8, 2026)
- Milton Board of Health — Rodent Control Guidance for Demolitions (checked November 8, 2026)
- MassDEP — Asbestos, Construction & Demolition Notifications (checked November 8, 2026)
- Town of Milton — How do I dispose of… (checked November 8, 2026)
- Milton Inspectional Services — Schedule of Fees (effective 5/1/09) (dated May 1, 2009; checked November 8, 2026)
More guides
- All demolition regulation guides
- Demolition Permit Guides for Boston, Quincy and the South Shore
- Massachusetts Asbestos & Demolition Notifications
- Massachusetts Construction Debris Disposal Bans
- South Shore Transfer Station Debris Rules
- Boston Dumpster Permits
- Boston Site Cleanliness License, Explained
- Boston vs. Quincy Demolition Permits
- Where construction debris can legally go: facilities south of Boston